Case Study: Oyster Wharf, London
A prestigious development on the bank of the Thames featuring modern design and construction methods. Three identical blocks featuring large curved balconies with multiple balustrades.
Not only was Alifabs expertise required in the surveying, manufacturing and fixing of the aluminium coping but also careful planning and programming by our team of experienced project managers to ensure a smooth interface between all trades with Alifabs involvement lasting over 18 months.


